Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-extended-search domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jfpcomau/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jfpcomau/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jfpcomau/public_html/wp-includes/functions.php on line 6114
MAROOCHYDORE SEWAGE TREATMENT PLANT - JFP Urban Consultants

MAROOCHYDORE SEWAGE TREATMENT PLANT

Kuluin – Sunshine Coast, South East Queensland

Client

TEW SOLUTIONS

Scale

SETOUT OF NEW CONVEYOR BELT

Services

+

Highlights

  • ULTRA PRECISE SET OUT OF MACHINERY

The Maroochydore Sewage Treatment Plant plays a significant role in the Sunshine Coast’s infrastructure network. It has the capacity to service approximately 100,000 local residents; with an outfall to the Maroochy River. As such, its non-stop operation is of prime importance.

JFP was tasked with providing ultra-precise set out Surveys, to 1mm accuracy, for a conveyor belt that was required to keep the Sewage Treatment Plant operational.

One of the challenges presented by the Survey, in addition to the high level of precision required, was the need to work in Confined Spaces within the live operational environment.

JFP delivered by completing the survey to the accuracy required in close cooperation with the mechanical engineer.